HOME/SOFTWARE DEVELOPMENT/ERP SYSTEMS
SOFTWARE / ERP

ERP: production and warehouse in one loop

A product estimate in 20 minutes instead of two days, live stock, piece-rate work orders and cutting maps straight to CNC — as in our manufacturing and agri projects.

FROM ₽1.2M · 12 WEEKS · YOU OWN THE CODE
ERPs DELIVERED
20 minPRODUCT ESTIMATE
−23%SHOP-FLOOR DOWNTIME
−17%FUEL WRITE-OFFS
01 / IS THIS ABOUT YOU?

Tick what you recognise

Five statements — and an honest verdict: do you need this service and which package to start with.

02 / LIVE MECHANIC

Configurator — change the parameters

The estimate recalculates instantly: materials, labour, cutting. In production this is backed by a norms base and a CNC cutting map.

“North” wardrobe
Estimate
246 600 ₽
SHEETS 12 · HARDWARE 1 · CUTTING 8% WASTE

Calculated by norms: sheet, hardware, edging, assembly. In production the button sends the cutting map to CNC.

CALC TIME · 0.2 SECWAS · 2 DAYS
03 / WHAT YOU GET

Not “a service” but concrete artefacts

What you hold at the end — we remove the fear of “paid and got nothing”.

Code in your repositoryRights by contract, git on your side
DocumentationArchitecture, API, playbooks
EnvironmentsTest, staging, production — yours from the first sprint
TrainingSessions, recordings, playbooks for the team
MigrationData migrates without loss
A month of supportIncluded: fixes, monitoring, answers
04 / SCOPE & PACKAGES

Pick a package — the scope highlights

Greyed out — what is not in the package. Ranges are medians of our projects.

05 / 60-SECOND ESTIMATE

Move the sliders — the range updates instantly

A benchmark based on medians of our projects. The exact estimate comes after the solution map.

06 / AN HONEST COMPARISON

Switch the scenario — we compare the alternatives

Sometimes the better deal is not ours — and we say so first.

07 / THE PROJECT WEEK BY WEEK

What we do and what you get every week

Hover a point. Only artefacts, no “work in progress”.

08 / OFTEN ORDERED TOGETHER

What usually goes together

09 / FAQ
Will you replace our 1C?

Usually not: 1C stays for accounting, the ERP takes production and the operational loop, with an exchange between them. Cheaper and safer than “moving everything”.

Production cannot stop. How do you roll out?

In loops: first a parallel run with the old process, reconciliation, then switch-over. No project has ever stopped a shop floor.

Can we roll out in parts?

Yes, in loops: warehouse or shop floor first, the rest later. Each loop pays for itself.

How is payment structured?

By milestones: deposit, after prototype, after launch. In T&M — per sprint, with an hours report every two weeks.

Who owns the code?

You do, by contract: the repository is on your side, no licence fees for “seats”.

What happens after launch?

The first month of support is included. Then — an SLA package with response times, or T&M per task.

Do you work with VAT and e-document flow?

Yes: an LLC with VAT, contracts and closing documents via e-document flow.

GOT A TASK?LET'S TALKGOT A TASK?LET'S TALK GOT A TASK?LET'S TALKGOT A TASK?LET'S TALK
29 / contact

Describe the task — we come back with an estimate in 48 hours

In your own words: “our managers drown in Excel” is enough. Task breakdown and a price range are free.

3 fields. The rest — on the first call